South Central Railway, Construction/Secunderabad issues a public notice (Proforma 1-10 & 2-10) regarding the energization of the new broad gauge third line with 25 KV AC overhead traction. The electrification covers the section between Sirpur Kaghaznagar (SKZR) and Asifabad Road (ASAF) stations from km 203/447.75 to km 215/39.50. The high voltage lines will be commissioned on 10-07-2026. The public is warned against approaching the live overhead wires or driving vehicles exceeding 4.78 meters in height at level crossings. Full details are available at scr.indianrailways.gov.in.